ARIMAR RAFT REVIEW OVER 12 MILES DM.77
The raft revision DM.77 must be carried out every 24 months from the last revision or from the date of purchase.
At the time of purchase of the REVISION SERVICE we will contact you to arrange the FREE collection of the raft to proceed with the review. We will pick up the Raft directly in the PLACE REQUIRED and send it back with all the CERTIFICATES and CERTIFICATES of revision to the DESIRED address.
The review is carried out through various operations aimed at ensuring the safety of the raft:
- Raft opening
- General check of the inflatable structure
- Checking the accessories
- Inflation and air tightness check
- Control of the equipment and possible replacement of those that have expired and are about to expire
- Checking, weighing and hydraulic testing, when necessary also of the inflation cylinder
- Container inspection and replacement when necessary or required
- Re-closing of the raft by highly specialized and qualified internal staff
The raft revision times are between 5 and 10 working days (shipments excluded) based on the period and requests
NB: Once you have purchased the service, send us the serial number of the raft and if possible insert the Old Revision Certificate inside the package.